Include the empty cabinet, fronts, dishes and likely use load. Confirm whether the wall was prepared for cabinets.
Method basis: Rigips/Knauf system guidance and Fischer/Hilti fixing-selection principles. Final parameters always come from the selected product data.
How to plan the installation
Use a rail to distribute forces and connect it to confirmed studs or reinforcement. Stop if the construction is unknown.
Common mistake
Do not rely on board-only cavity anchors for heavy cabinetry or assume double board replaces reinforcement.
Pre-start check
- Was the structural base identified rather than only the finish?
- Does the weight include contents and projection?
- Were services, edges and minimum spacing checked?
- Does the product data permit the base, direction and environment?