Include the loaded cabinet and hanging method. A rail has many holes, but an uneven wall may leave only some points working.
Method basis: Rigips/Knauf system guidance and Fischer/Hilti fixing-selection principles. Final parameters always come from the selected product data.
How to plan the installation
Remove loose finishes at bearing areas, drill perpendicular clean holes and follow installation torque.
Common mistake
Do not over-tighten a rail against a crooked wall or assume all holes share load equally.
Pre-start check
- Was the structural base identified rather than only the finish?
- Does the weight include contents and projection?
- Were services, edges and minimum spacing checked?
- Does the product data permit the base, direction and environment?